DeDietrich G25 Wartungshandbuch Seite 33

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 92
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 32
33
15/02/2011 - 300014279-001-J DTG(E)130 - 35/45/65/90/115 Eco.NOxPlus
8. Connecting the furnace
8.4.1 Classification
(x) For Germany only
Belgium: Boilers can only be installed with flue gas connection pipes
provided by the constructor. For the list of parts, refer to the current
price list.
6
C001246
1
2
2
7 333 4 25
1
Homologation C
13x
: Air/flue gas connection by means of concentric
pipes to a horizontal terminal (so-called forced flue)
2
Homologation C
33x
: Air/flue gas connection by means of concentric
pipes to a vertical terminal (roof outlet)
3
Homologation C
93x
: Air/flue gas connection by concentric pipes in
the boiler room and single pipes in the chimney (combustive air in
counter current in the chimney)
4
Homologation C
93x
: Air/flue gas connection by concentric pipes in
the boiler room and single "flex" in the chimney (combustive air in
counter current in the chimney)
- Only factory components are authorised for connecting
the boiler and the terminal.
- The clear section must comply with the standard.
- The chimney must be swept before the installation of the
evacuation conduit.
5
Homologation C
53
: Air and flue gas connection separated by means
of a bi-flow adapter and single pipes (combustive air taken from
outside)
6
Homologation B
23P
: Chimney connection (combustive air taken
from the boiler room)
7
Homologation B
23P
: Cascade installation
Compulsory accessories:
Flue damper (Package HC154)
Alarm and control module AM35 (Package GR12)
For information about the connection to the electrical terminal block,
refer to the instructions delivered with package GR12
Seitenansicht 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 91 92

Kommentare zu diesen Handbüchern

Keine Kommentare